mgt324 Chapter 7: Question #7 – Page 161 of Operations & Supply Management 14th Ed, management

1. Chapter 7: Question #7 – Page 161 of Operations & Supply Management 14th Ed (2 pts)

For each of the following variables,explain the differences (in general) as one moves from a workcenter to an assembly line environment.

  • a. Throughput time (time to convert raw materials into product)
  • b. Capital/labor intensity
  • c. Bottlenecks

2. Chapter 7: Question #8 – Page 161 of Operations & Supply Management 14th ed (2 pts) ( Reference the example 7.1 on page 152)
A book publisher has fixed costs of $300,000 and variable costs per book of $8.00. The book sells for $23.00 per copy

  • a. What is the break even point?

FACILITY LAYOUT PROBLEM

ABC Corporation is planning to assemble a lawnmower using an assembly line. The following table provides the job elements and their precedence elements and the element times.

ELEMENT PRECEDENCE ELEMENT ELEMENT TIME
A none 30 seconds
B none 30 seconds
C A 20 seconds
D B 20 seconds
E C,D 30 seconds
F E 40 seconds
G F 10 seconds

 

Draw the precedence diagram of this assembly job. (2PTS) ( see page 176-178 of your text book, Exhibit 8.9&8.10).

If the production requirement for the lawnmower is 500 units per 8 hour shift, what will be the speed of this assembly line? (2PTS)

(Line speed = Time allotted per shift in seconds/no. of units produced per shift)

SERVICE PROBLEMS

Chapter 9: Question #1&3 – Page 217 of Operations & Supply Management 14th ed (2 pts)

  • 1.What is the term used for a bundle of goods and services that are provided in some environment by every service operation?
  • 2. List the 3 significant ways in which service systems differ from manufacturing systems.

Write your responses in a word document. Please show your work. Upload and submit the file via the title link

Still stressed from student homework?
Get quality assistance from academic writers!

Facing Problems With Your Teacher Certification Exam Study Guides, Help Is Here!